THREE GREEN LOGIN

1800 060 305

our services; risk management

Political instability, port strikes, child labour, exchange rate fluctuations, cyclones that close factories or rail transportation or ports, materials found to be let’s say “unpalatable” or faulty, etc, are all things that you need to be insulated from.

Our job is to design and plan well, then to the full extent possible, manage, insulate and mitigate you from all risks, as best is humanly possible, through all the avenues available. Projects are not risk free. All projects carry an element of risk. With Three Green the only risk you bear is the possibility of time delays due to factors outside our area of influence or control.

We accept1 all exchange rate fluctuation risk.

1 Conditional upon quotes being accepted within communicated periods and or provided the exchange rate has not moved substantially [being greater than 5%] from when the quote was provided.
risk management
| VIDEO |
Three Green | Engaging Product Solutions
Phone 1800 060 305
Email
This email address is being protected from spambots. You need JavaScript enabled to view it.